TRANSIT TERMINAL OF ALFRED C. TOEPFER INTERNATIONAL SA
START OF WORK:: 203
TIME: One and half years
WORK::Transit Terminal
TYPE: Turnkey work.
LOCATION: Km. 449,5 del Río Paraná, en Puerto San Martín, Prov. Santa Fe, Argentina
INVESTMENT: 35.000.000 de dólares
Implementation
MATERIAL: 3500 m³ of concrete
IRON: 1530 tons of iron in profiles for metal structures and transport equipment
Storage capacity
GRANOS: 140.000 tons en silos celda de 90.000 tons y 30.000 tons y silos Aéreos
SUBPRODUCTS: 22,000 tons
OILS: 20.000 tons

Characteristic
- LOAD RATE: Solid 1600 tn / h with two hands – Liquid 900/1000 tn / hs with three lines
- FRETWORK: 32 foot
- DOCK: Four docking dolphins, with a length of 150m. Between extreme dolphins and two mooring dolphins. Two galleries of feeding, of metallic structure, of 400 mts. Of length. Three metal loading towers. Oil loading table.
- Mechanizations and motorizations
- Aspiration system and powder injection.
- System of interlocking of reception and boarding by PLC
- Continuous flow loading balance.
- Double reception scale and three dump platforms, for complete equipment, of 15 cycles / hour each.