PIEDRA BUENA PIER

START OF WORK1985
TIME: Two years
WORK: Dock
TYPE: Turnkey work.
LOCATION: A Alcorta s/n, Ing. White, Bahia Blanca, Pcia. Buenos Aires, Argentina
INVESTMENT : 23,000,000 dollars

Implementation

MATERIAL: 5,500 m³ of concrete
IRON: 5200 tons of iron in profiles for metal structures and transport equipment.

Storage capacity

GRAINS AND SUB-PRODUCTS: 97,000 tons in cells and air silos. Tubular silos of flat floor with sweeping system in the background. Silo 80,000 tons

Characteristic

  • LOAD RATE: Solid 1800 tn / h with three hands
  • FRETWORK: 45 foot
  • DOCK: Length of 365 m.
  • Loading tunnel with palpating scale
  • Area for 250 trucks
  • Boarding tape of 650 m. with hoods.
  • Double reception scale and three dump platforms, for complete equipment, of 15 cycles / hour each.
  • Automatic sampler
  • Wagon unloading with built-in scale and through a 500 m belt. protected with hoods

Description

Four porticoes of own design composed of two columns, which run along the beams of the pier, and crossbeam. Inside the latter runs a telescopic beam with receiving tape of a lifting wheel and multidirectional loading tube that allows a perfect final fulleration. This tube is telescopic, tiltable and with 360 ° rotation and trimmer.