PIEDRA BUENA PIER
START OF WORK: 1985
TIME: Two years
WORK: Dock
TYPE: Turnkey work.
LOCATION: A Alcorta s/n, Ing. White, Bahia Blanca, Pcia. Buenos Aires, Argentina
INVESTMENT : 23,000,000 dollars
Implementation
MATERIAL: 5,500 m³ of concrete
IRON: 5200 tons of iron in profiles for metal structures and transport equipment.
Storage capacity
GRAINS AND SUB-PRODUCTS: 97,000 tons in cells and air silos. Tubular silos of flat floor with sweeping system in the background. Silo 80,000 tons
Characteristic
- LOAD RATE: Solid 1800 tn / h with three hands
- FRETWORK: 45 foot
- DOCK: Length of 365 m.
- Loading tunnel with palpating scale
- Area for 250 trucks
- Boarding tape of 650 m. with hoods.
- Double reception scale and three dump platforms, for complete equipment, of 15 cycles / hour each.
- Automatic sampler
- Wagon unloading with built-in scale and through a 500 m belt. protected with hoods

Description
Four porticoes of own design composed of two columns, which run along the beams of the pier, and crossbeam. Inside the latter runs a telescopic beam with receiving tape of a lifting wheel and multidirectional loading tube that allows a perfect final fulleration. This tube is telescopic, tiltable and with 360 ° rotation and trimmer.